TRAFFIC INFRA_HAMBURG_AKN Railway infrastructure
Transcrição
TRAFFIC INFRA_HAMBURG_AKN Railway infrastructure
Page 1/1 TRAFFIC INFRASTRUCTURE Railway infrastructure in HamburgEidelstedt, Germany Cross-section of the trough station The suburban line Hamburg - Kaltenkirchen (AKN Eisenbahn AG) will be extended to a 2 track line partially built in a trough structure. The design of the new station Eidelstedt Centre corresponds to the features of a subway station. Client: AKN Eisenbahn AG, Kaltenkirchen, Germany Sellhorn provided detailed engineering and structural design for all structures of a 2.6 km long section including: Construction Costs: approx. 20 mill. € • 600 r.m long rail trough, covered by 3 road bridges • 120 r.m long subway railway station • 3 road bridges with different spans und widths • commercial centre above the railway station • extension of existing railway bridge • about 900 r.m long noise protection barriers Services: concept, detailed engineering, design, tendering, supervision Period: 2000 - 2004 Cooperation: ICB Hamburg, ICB Berlin Architektur und Stadtplanung, Braunschweig In addition Sellhorn coordinated architectural and landscape designs, the planning and installation of all technical facilities and security devices. The works were completed early 2004 after 2.5 years of construction. During this period the railway operation and the road traffic continued. South entrance of rail trough Project-No. 9932 Sellhorn Ingenieurgesellschaft mbH, Teilfeld 5, 20459 Hamburg, Germany, Phone+49 (0)40 36 12 01-0, Fax +49 (0)40 36 12 01-28 [email protected], www.sellhorn-hamburg.de LKP 20110930