HULL CONVERSION OF THE FPSO P-58 (RIO
Transcrição
HULL CONVERSION OF THE FPSO P-58 (RIO
PROJECT TITLE Hull conversion of the FPSO P-58. DATE May 2012. BACKGROUND Upon completion of the hull conversion, the FPSO will be installed in the pre-salt Baleia Azul field in the state of Espirito Santo which is approximately 78km offshore in water depths of 1,400 meters. The platform will be able to produce, process, store and dispose of oil with production capacity of 180,000 barrels of oil per day and the capacity to compress 6 million cubic meters of gas per day . There will also be water injection of 350,000 barrels per day and accommodation for 110 people. HULL CONVERSION OF THE FPSO P-58 (RIO GRANDE, BRAZIL) Heavy Lift Slings, Grommets and Shackles ITEMS •2 x Cable Laid Grommets, 156mm dia x 29 mtr length, CGBL 1196MT •4 x Cable Laid Grommets, 156mm dia x 22.6 mtr length, CGBL 2104 MT •4 x Cable Laid Grommets, 156mm dia, x14.1 mtr length, CGBL 2104 MT •2 x Cable Laid Grommets x 156mm dia x 8.3 mtr length, CGBL 2104 MT •4 x Cable Laid Grommets, 156mm dia, x 7.4 mtr length, cGBL 2104 MT •2 x Cable Laid grommets, 156mm dia, x 5.5 mtr length, CGBL 2104 MT •2 x CableLaid Grommets, 156mm dia, x 5.4 mtr length, CGBL 2104 MT •2 x Cable Laid Grommets, 156mm dia, x 5 mtr length, CGBL 2104 MT •4 x Cable Laid Grommets, 144mm dia x 22.4 mtr length, CGBL 1808 MT •4 x Cable Laid Grommets, 126mm dia x 19 mtr length, CGBL 1399 MT •4 x Cable Laid Grommets, 126mm dia, x 32.5 mtr length, CGBL 1399 MT •4 x Crosby G-2160 Wide Body Shackles, 800MT •14 x Crosby G-2160 Wide Body Shackles, 700MT •8 x Crosby G-2160 wide Body shackles,, 600MT All manufactured and tested by KTL Offshore in Singapore. Witnessed and certified by ABS.
Documentos relacionados
THE YADANA SUBSIDENCE PROJECT (Myanmar)
DATE December 2012. BACKGROUND Upon completion of the hull conversion, the FPSO will be installed in the presalt Baleia Azul field in the state of Espirito Santo which is approximately 78km offshor...
Leia mais