+ 198 Large Supply Vessels until 2020

Transcrição

+ 198 Large Supply Vessels until 2020
Opportunities for Suppliers in the Off-shore
and Naval Brazilian Industry
DEUTSCH-BRASILIANISCHE INDUSTRIE- UND HANDELSKAMMER
RIO DE JANEIRO JUN2014
World Cenarium
Global Marine Trends 2030
• Strong growth untill 2030.
• Biggest participation of
China in the maritime
industry.
• Growth in the world
maritime commerce from
9 to 19 billion yearly ton.
GMT 2030
Shipbuilding Evolution
Oil platforms evolution
Regions /
Countries
North America
South America
África
Europ
Ásia
Japan
Austrália
Mediterran
Others
Total
2010
2030
48
58
51
42
27
19
16
3
6
270
56
67
107
46
110
30
20
55
127
618
Global Marine Trends 2030 – producted by Lloyd Register,
Qinetiq e Strathclyde University, in two years of studies
about the future of the maritime industry.
Data from Opep
Investiments on oil production,
from 2012 a 2035, are estimated
on US$ 5,2 trillion.
The major part will be on the
offshore production.
Brasil is the biggest in quantity of
offshore field to get in production
Fonte: OPEP – World Oil Outlook 2013
Data from Opep
The forecast of oil consumption
represents a challenger to the
productors countries.
Oil Consumption in
million barrels/day
2010
81,2
2020
89,7
Fonte: OPEP – World Oil Outlook 2013
2035
100,2
The production from the non
affiliates countries to OPEP will
give the biggest contribution to
the production increment.
In Latin America, the production
will increase from the actual
4,2 to 5,5 mb/d, em 2018.
Brasilian aditional production
will be the biggest contribution,
with 1,2 mb/d.
Petrobras data
New positioning announced by the
President of Brasil at the end of 2013:
• Maintenance of the Local Content
Policy.
• Focus on the production
• “We will need more 12 to 16 platforms
for the Libra Field”.
President of Brasil and the
President from Petrobras.
Delivery of the platform P-58, in
the Polo Naval Sul, Rio Grande
(RS).
• Best planning on orders to have less
oscilation on jobs in the shipyards.
Agenda
Major National Shipyards – Technical File
Offshore and Naval Equipment Demand
Agenda
Major National Shipyards – Technical File
Offshore and Naval Equipment Demand
Capacity and Occupancy of Major Shipyards and
Construction Sites
Mauá
Occupancy
State
City
• 8 Panamax
Rio de Janeiro
Niterói
• 7 Light Products
Available Area
Steel Processing
334.000 m2
36.000 tons per year
• 2 Dark Products
• 1 Building Modules and Integration
(FPSO Cidade Ilha Bela)
Dry Docks
Quays
Careers
1
4
1
Source: SINAVAL
Labor Peak:
3.950 people in Sep/2014
Current Situation
In Operation
Capacity and Occupancy of Major Shipyards and
Construction Sites
Brasfels
Occupancy
State
City
• 6 Semi-submersible Drilling
Rigs
Rio de Janeiro
Angra dos Reis
• 1 Hull Construction and Integration
(P-61)
Available Area
Steel Processing
410.000 m2
50.000 tons per year
• 2 Building Modules and Integration
(Replicantes 1 and 4)
• 2 Integrations (Cidade São Paulo
and Cidade Paraty)
Dry Docks
Quays
Careers
1
2
3
Source: SINAVAL
Labor Peak:
7.900 people in Aug/2014
Current Situation
In Operation
Capacity and Occupancy of Major Shipyards and
Construction Sites
ERG 1 and ERG 2
Occupancy
• 8 Hull Constructions
(Replicantes 1 - 8)
(ERG 2)
• 3 Drilling Vessels
• 1 Building Modules, Topside and
Integration (P-55)
State
City
Rio Grande do Sul
Rio Grande
Available Area
Steel Processing
834.300 m2
120.000 tons per year
Dry Docks
Quays
Careers
1
2
0
Source: ENGENHARIA
Labor Peak:
7.750 people in Sep/2015
Current Situation
In Operation (ERG 1) / Under construction (ERG 2)
Capacity and Occupancy of Major Shipyards and
Construction Sites
Atlântico Sul (EAS)
Occupancy
• 11 Suezmax
• 8 Aframax
• 1 Building Modules, Conversion and
Integration (P-62)
• 7 Drilling Vessels
State
City
Pernambuco
Ipojuca
Available Area
Steel Processing
1.500.000 m2
160.000 tons per year
Dry Docks
Quays
Careers
1
2
2
Source: SINAVAL
Labor Peak:
8.000 people in Aug/2016
Current Situation
In Operation
Capacity and Occupancy of Major Shipyards and
Construction Sites
Enseada do Paraguaçu (EEP)
Occupancy
• 6 Drilling Vessels
State
City
Bahia
Maragogipe
Available Area
Steel Processing
1.600.000 m2
36.000 tons per year
Dry Docks
Quays
Careers
1
1
0
Source: SINAVAL
Labor Peak:
4.200 people in Apr/2016
Current Situation
Under Construction
Capacity and Occupancy of Major Shipyards and
Construction Sites
Jurong
Occupancy
State
City
• 7 Drilling Vessels
Espírito Santo
Aracruz
• 2 Building Modules and
Integration(Replicantes 3 and 6)
Available Area
Steel Processing
825.000 m2
48.000 tons per year
Dry Docks
Quays
Careers
1
1
0
Source: SINAVAL
Labor Peak:
4.850 people in Oct/2016
Current Situation
Under Construction
Capacity and Occupancy of Major Shipyards and
Construction Sites
Inhaúma
Occupancy
• 4 Hull Conversion – Transfer of Rights
(P-74, P-75, P-76 and P-77)
State
City
Rio de Janeiro
Rio de Janeiro
Available Area
Steel Processing
320.000 m2
42.000 tons per year
Dry Docks
Quays
Careers
2
2
0
Source: ENGENHARIA
Labor Peak:
4.800 people in Nov/2012
Current Situation
In Modernization
Capacity and Occupancy of Major Shipyards and
Construction Sites
Shipyards - 8 FPSO Replicantes Modules
DM-TKK Consortium – Itajaí (SC) – Total Area of 98.300m2 – In Planning
• 8 Building Fuel Gas and
Dehydration Modules
• 8 Building Generation 2 Modules
• 8 Building Generation 1
Modules
IESA – Charqueada (RS) – Total Area of 359.300m2 – Under Construction
• 8 Building CO² Compression
Modules
• 8 Building Main Compression
and Vapor Recovery Modules
• 8 Building Gas Compression
Exportation Modules
• 8 Building Injection Gas
Compression Modules
Tomé/Ferrostal – Maceió (AL) – Total Area of 77.000m2 – Under Construction
• 8 Building Oil Processing
Modules
• 8 Building Launchers, Receivers and
Manifolds Modules
• 8 Building Oil Processing and
Production Water Treatment Modules
Capacity and Occupancy of Major Shipyards and
Construction Sites
Other Shipyards and Construction Sites
Occupancy
Occupancy
• 7 Gas Tankers – Itajaí (SC)
Shipyard
• 1 Building and Integration
Modules (Cidade Ilha Bela –
SBM/Brasa (RJ)
• 4 Panamax – EISA (RJ)
• 2 Building Probe (Jack-up P-59
and P-60) – CRP (BA)
• 3 Bunkers – SUPERPESA (RJ)
• 2 Building Modules (P-55 and P63) – Porto Rio Grande (RS)
• 3 Bunkers – São Miguel (RJ)
• 1 Building Modules and
Integration (P-58) – Porto
Rio Grande (RS)
• 8 GLPs – STX Promar (PE)
• 2 Building Modules (P-58 and P62) – UTC (RJ)
• 2 Building Modules (P-58 and P62) – NUCLEP (RJ)
• 1 Building Modules (Cidade
Paraty) – EBSE (RJ)
• 7 Light Products – Rio
Nave (RJ)
• 3 Dark Products – Rio
Nave (RJ)
Agenda
Major National Shipyards – Technical File
Offshore and Naval Equipment Demand
Petrobras Vessels
Current and projected fleet
Future Demand (2013-2020)
2020 Strategic Planning
Critical Resources
Tanker Vessels (DWT x 1000t)
Future Situation
Jan/12 Accumulated Values(1)
Situation
By 2016
By 2020
16,000
19,000
24,500
Large Supply Boats*
216
313
358
Production Units (SS and FPSO)
45
56
81
Drilling Rigs (SWD > 2.000 m)
26
42
65
(1) The future situation of 2020 does not reflect the sum of the current situation with future
demand, as there are vessels whose contracts expire by 2020. This demand may be revised
as necessary.
(2) Future Demand includes hired demand, demands in hiring phase and yet to be hired
demand.
+ 88 Tanker Vessels
+ 198 Large Supply
Boats
+ 38 Production
Units
+ 48 Drilling Rigs**
Significant equipment demand mapping:
Historically imported equipment with potential to attract foreign suppliers
Equipment produced nationally but with potential bottlenecks in production capacity
Source: Transpetro; PNG 2012-16; Petrobras (E&P-SERV/US-CONT and AB-LO/TM)
Tanker Vessels
Fleet increase by 2020
Petrobras Fleet Growth Program with
Brazilian Vessels
PROMEF I and II
EBN I and II
49 Vessels until 2020
39 Vessels until 2017
12 Products
8 L&G
3 Bunkers
14 Suezmax
8 Aframax
4 Panamax
26 Products
6 Bunker
7 L&G
3 delivered Vessels and 22 Vessels in advanced stage of
construction
2 Vessels in advanced stage of construction
24 Vessels in hiring phase or initial
construction phase
37 Vessels in hiring phase or initial
construction phase
Equipment demand not yet addressed for 61 Vessels (until 2020)
Example of equipment with potential for national development
61 Vacuum Sewage Systems
72 Life Boats + Davit
53 Inert Gas Generation Unit
1.830 Accomodation Cabines
Source: Transpetro; Petrobras (AB-LO/TM)
Tankers orders
Promef – Delivery and forecast of tankers
Estaleiros / Navios
2012 2013 2014 2015 2016 2017 2018 2019 2020
EAS (PE)
10 Suezmax
1
2
3
2
2
4 Suezmax DP
3
1
5 Aframax
2
2
1
3 Aframax DP
3
Mauá (RJ)
11 product vessels
2
1
2
3
3
4 Panamax
3
1
VARD Promar (PE)
8 gas tankers
2
3
3
Shipyard to be defined
3 bunker
1
2
Total: 48 navios
3
3
8
8
8
5
2
5
6
Fonte: Petrobras
Delivery of vessels
to Transpetro untill
april 2014:
Nov 2011 - Celso Furtado
(Mauá)
May 2012 - João Cândido
(EAS)
July 2012 - Sérgio Buarque
de Holanda (Mauá)
Jan 2013 - Rômulo Almeida
(Mauá)
May 2013 - Zumbi dos
Palmares (EAS)
Jan 2014 – José Alencar
(Mauá)
Apr 2014 – Dragão do Mar
(EAS)
Tanker Vessels
Main demands for equipment
Demand for the 61 Vessels to be delivered between 2013 and 2020
Equipament
Equipament
Demand
Demand
MAIN ENGINE (UN)
61
LIFEBOAT (UN)
72
AUXILIARY ENGINE (UN)
177
INFLATABLE BOATS (UN)
355
PROPELLERS (FPP & VPP) (UN)
61
AZIMUTAL & TUNNEL THRUSTERS (UN)
12
AUXILIARY BOILERS(UP TO 35 TONS PER HOUR)
(UN)
EXHAUSTED GAS ECONOMIZER/COMPOSED
BOILER (UN)
66
51
THERMAL OIL HEATER (UN)
12
START AIR COMPRESSORS (30 BAR) (UN)
111
AIR COMPRESSOR (UN)
170
PLATE HEAT EXCHANGER (UN)
333
FRESH WATER GENERATOR (UN)
55
VALVES (UN)
75.270
ELETRIC(MAIN/AUX) SWITCHBOARDS (UN)
120
WINDLASS / WINCH (UN)
346
CHAINS (KM)
39
CRANES (3 TO 20 TONS) (UN)
214
ANCHORS (UN)
144
Source: Transpetro; Petrobras (AB-LO/TM)
TOILET UNITS (UN)
1.849
PURIFIERS (UN)
293
INTEGRATED BRIDGE (UN)
61
CARGO PUMPS(FUEL OIL,DIESEL OIL, LUB. OIL)
(UN)
67
CARGO PUMP (DEEP WELL) (UN)
384
MOORING LINES (UN X 200 METRES)
840
CHOCK, BOLLARD (UN)
7.271
ACCESS HATCH (UN)
1.220
VACUUM SEWAGE SYSTEMS (UN)
61
INERT GAS GENERATION UNIT (UN)
53
LIFE BOATS + DAVIT (UN)
72
ARCHITECTURE MATERIALS
(ACCOMODATION PACKAGE)
61
MANUAL OPERATED VALVES (TON)
58.500
PIPES (TON)
9.800
FITTINGS (TON)
7.900
Large Supply Vessels
Fleet increase by 2020
Current Petrobras Fleet
Quantity
AHTS
Maintenence TO´s + DMA´s + New Production Units
Instalation + FPSO`s and NT´s Operation
OSRV
Future Demand
55
+ 198 Large Supply Vessels
36
until 2020
Oil Recovery
(almost the same quantity as the current
PSV
125
fleet – 216)
General Cargo + Oil + Bulk + Cement
TS
Tugs + Oil Recovery
LH
SOS Standby + Handling Spy (messenger)
SV
SOS Standby
UT / P
Emergency Cargo / Passenger
Source: E&P-SERV/US-CONT
21
30
4
38
Example of equipment with potential for national
development
198 Offshore Cranes
198 Vacuum Sewage Systems
396 Life Boats
55.700 Manual Operated Valves
44.550 ton of Pipinp
4.800 ton of Fitting
Balance 2013
Large Supply Vessels
Main demands for equipment (1/2)
Demand for 198 vessels to be delivered until 2020
Equipament
Equipament
Demand
Classified profiles (ton)
59.400
Shock fast (UN 300L)
1.584
Demand
Provisions crane (UN)
198
Compressors for bulk (UN)
198
Cargo pump (UN)
1.188
Directional propulsion system (UN)
396
Transverse thrusters (UN)
396
Control systems and supervising machines
(system)
Generator set (UN)
792
Metal pipes (yards) (meters)
Emergency generator - port (UN)
198
Valves (estimated) (pieces)
74.250
Compressors (UN)
594
Manual Operated Valves (estimated) (pieces)
55.700
Oil Purifier (UN)
396
Fittings (estimated) (ton)
4.800
Oil water separator (UN)
198
Parts passage (UN)
19.800
Heat exchanger (UN)
792
Fans and blowers (UN)
7.326
Vacuum sewage system (system)
198
Air-conditioning system (system)
198
Fresh water heater (UN)
198
Domestic refrigeration (system)
198
Laundry equipment (set)
396
Trailer/mooring winch (UN)
396
Source: E&P-SERV/US-CONT
198
1.584.000
Main switchboard (set)
198
Distribution Panels (UN)
3.960
Starters (UN)
1.980
Spotlights and reflectors (UN)
3.960
Navigation lights (set)
198
Aldis lamp (UN)
198
Battery charger (UN)
198
Static Inverter/Frequency Converter (UN)
792
Rotary guard and cleaner (UN)
4.950
Large Supply Vessels
Main demands for equipment (2/2)
Demand for 198 vessels to be delivered until 2020
Equipment
Demand
Equipment
Demand
Self excited phone (UN)
792
Fixed firefighting system (system)
198
Fonoclama and TV and sound system (system)
198
Smoke and heat detectors (set)
198
Transformers and Rectifiers (UN)
396
General alarm (system)
198
Radar (UN)
396
Whistle (UN)
198
Navigation, communication and signaling
equipments (set)
198
Magnetic needle (UN)
198
Eco-probe and echobathymeter (UN)
198
General bulkheads (m 2)
396.000
VHF Radio (UN)
792
Ceiling and bulkhead liners (m 2)
396.000
SSB Radio (UN)
396
Paving (m 2)
178.200
Odometer (UN)
198
Doors class B (UN)
Automatic Pilot (UN)
198
Anchors (UN)
396
Satellite navigator+ Ploter (UN)
396
Mooring lines (UN)
396
Automation System/Micro Full (system)
198
Cables mooring and trailer (UN)
1.782
Dynamic Positioning System(system) (system)
198
Rubber Fenders (UN)
3.960
Steel doors (UN)
Ducts of natural and forced ventilation (UN)
5.940
594
Motorized service boats (UN)
9.900
198
Small Lifeboat (UN)
1.188
Windows (UN)
7.524
Buoys and life jackets (UN)
1.584
Guards and wide eyes (UN)
5.940
Boats transceivers (UN)
1.188
Source: E&P-SERV/US-CONT
Production Units
Fleet increase by 2020
Operation Startup Timeline for Petrobras Production Units
Production Units considered for the equipment demand analysis
Equipment demand not
yet addressed for 27
Production Units to be
delivery until 2020
Example of potential equipment
for national development
81 Chemical Injection Units
81 Offshore Cranes
27 Vacuum Sewage System
81 Offloading System
108 Life Boats + Davit
Construction Site
189.000 Manual Operated
Abroad
Valves
Abroad/Brazil **
54.000 ton of Piping
Brazil
43.200 ton of Fittings
To be defined
Source: PNG 2012-16; Sinaval
ND: Not defined
* Charted Production Unit
** Integrated in Brazil with imported Hull or Modules
Orders book
Production Platforms
Delivery and Forecast from
2013 and forecast for 2014
2013 (delivered)
P-55 – SS
P-58 – FPSO
P-61 – TLWP
P-62 – FPSO
P-63 – FPSO
Cidade de Paraty – FPSO
2014 (forecast)
Cidade de Mangaratiba –
FPSO
Cidade de Ilhabela – FPSO
Shipyard
EAS (PE) – Hull.
QUIP (RS) – Módules. 100% built in Brasil.
QUIP (RS) – Integration of modules.
BrasFELS (RJ) – First platform TLWP (Tension Leg Wellhead
Platform) built in Brasil
EAS (PE) – Integration of modules.
QUIP (RS) – Integration of modules.
BrasFELS (RJ) – Integration of modules.
BrasFELS (RJ) – Integration of modules.
Estaleiro Brasa (RJ) – Integration of modules.
29
Production Units
Main demands for equipment – Topside
Demand for the 27 Production Units to be delivered between 2015 and 2020
Package/Skid
Demand
(units)
Package/Skid
Demand
(units)
ELETRO CHLORINATION UNIT
31
WATER INJECTION PUMPS PACKAGE
27
VAPOR RECOVERY UNIT
54
WELL SERVICE PUMP PACKAGE
27
GAS DEHYDRATION UNIT
27
RECIPROCATING PUMPS PACKAGE
27
VACUUM DEAERATOR UNIT
27
POSITIVE DISPLACEMENT PUMPS PACKAGE
27
CHEMICAL INJECTION UNIT
81
FILTERS PACKAGE
27
H2S REMOVAL UNIT
27
PIG LAUNCHERS & RECEIVERS PACKAGE
27
NITROGEN GENERATOR UNIT
27
MECHANICAL HANDLING EQUIPMENT PACKAGE
27
SULPHATE REMOVAL UNIT
27
ICSS – INTEGRATED CONTROL & SAFETY SYSTEM
27
ELECTROSTATIC TREATERS PACKAGE
27
HYDRAULIC POWER UNIT - HPU
27
PRODUCED WATER TREATMENT
27
FISCAL METERING SKID
27
FLARE GAS RECOVERY COMPRESSION UNIT
27
ELECTRICAL AND AUTOMATION MODULE
27
FLARE
27
HVAC SYSTEM
27
FRESH WATER MAKER
27
EXPORTATION GAS COMPRESSION UNIT
27
SHELL&TUBES HEAT EXCHANGE PACKAGE
27
CO2 COMPRESSION UNIT
27
PLATE HEAT EXCHANGERS PACKAGE
27
MAIN GAS COMPRESSOR
27
PRESSURE VESSELS / SEPARATORS PACKAGES
27
INJECTION GAS COMPRESSION UNIT
27
CENTRIFUGAL PUMPS PACKAGE
27
MAIN TURBOGENERATOR UNIT
27
SEA WATER LIFT PUMPS PACKAGE
27
Source: PNG 2012-16; Sinaval
Production Units
Main demands for equipment – Loose Equipment
Demand for the 27 Production Units to be delivered between 2015 and 2020
Equipment
COMPRESSOR
PRESSURE VESSEL (Scrubber/Separator/K.O.Drum)
TANK
Demand
567
1.674
729
CONTROL PANEL (Distribution panel)
2.241
PUMPS
2.808
HYDROCYCLONES / GAS FLOTATION
189
FILTER
594
SHELL&TUBES HEAT EXCHANGER
PLATE HEAT EXCHANGER
MECHANICAL HANDLING EQUIPMENT
1.269
486
2.862
OIL DEHYDRATOR / PRE-OIL DEHYDRATOR
54
OIL DEHYDRATOR DEGASSER / PRE-OIL DEHYDRATOR DEGASSER
54
PIG LAUNCHERS & RECEIVERS
648
CONTROL, SHUTDOWN, CHOKE, PRESSURE SAFETY, DELUGE VALVES
21.600
MANUAL VALVES (un)
189.000
PIPING (ton)
54.000
FITTING (ton)
43.200
CABLE (Electrical/Instrumentation/Telecom) (km)
13.500
INSTRUMENTATION (Transmitter/Gauge/Indicator) (un)
54.000
Source: PNG 2012-16; Sinaval
Production Units
Main equipment demand – Hull
Demand for the 27 Production Units to be delivered between 2015 and 2020
Equipment
Demand
(units)
Equipment
Demand
(units)
OFFSHORE CRANE API-2C (50T)
81
FIRE DETECTION SYSTEM
27
ALUMINIUM HELIDECK
27
ENVIRONMENTAL & POSITIONING SYSTEM
27
LIFEBOAT & DAVIT
108
NAVIGATION AID SYSTEM
27
RESCUE BOAT & DAVIT
108
OFFLOADING SYSTEM
27
FOAM FIREFIGHTING SYSTEM
27
MOORING SYSTEM
108
CO2 FIREFIGHTING SYSTEM
27
PULL-IN / PULL-OUT SYSTEM
27
OFFLOADING SYSTEM
54
SUBMERGED CARGO PUMPS
378
INERT GAS SYSTEM
27
SUBMERGED DEBALLAST PUMPS
162
SEWAGE TREATMENT & VACUUM UNIT
27
CONTROL VALVES SYSTEM (un)
AUXILIARY & EMERGENCY DIESEL GENERATOR
54
HELICOPTER REFUELING SYSTEM
27
DIESEL FIRE WATER PUMP
54
DIESEL PURIFIER
27
BALLAST PUMPS
108
VAC SYSTEM
27
COOLING WATER PUMPS
54
ACCOMODATION PACKAGE
27
FRESH WATER GENERATOR
54
AUTOMATION & ELECTRIC PACKAGE
27
PORTABLE WATER GENERATOR
54
Source: PNG 2012-16; Sinaval
5.400
Modules Order Book
FPSOs Integration of modules
Tomé – Ferrostaal (RS):
Modules for 06 platforms FPSO “replicantes” under construction in ERG, em Rio Grande (RS).
EBR – Toyo (RS):
Modules for FPSO P-74 (hull in construction on Estaleiro Inhaúma - RJ).
Technip – Techint (PR):
Modules for FPSO P-76 – (hull in Estaleiro Inhaúma – RJ)
Estaleiro Brasa (RJ):
Modules for 02 FPSOs built in Asia for SBM-Queiroz Galvão Óleo e Gás.
Mendes Júnior – OSX (RJ):
Built and Integration of 08 modules for FPSO to consortium Petrobras, BG Group, e Petrogal for
Pre-Salt field.
EAS (PE):
Integration of modules P-62.
33
Drilling Rigs
Fleet increase by 2020
Petrobras Drilling Rigs Startup Timeline
+14
Drilling rigs considered for the
equipment demand analysis
Equipment demand not
yet addressed for the 29
drilling rigs to be
delivery until 2020
+9
Example of equipment with
potential for national development
+8
+6
+5
+5
+1
Construction Site
Source: Petrobras; Sinaval
Abroad
Brazil
29 Derrick Structure
29 Traveling equipment
29 Choke and Kill Manifold
29 sets of Risers
29 BOP (parcial)
29 sets Eletrical System
174 Main Diesel Generators (parcial)
29 Emergency generators
87 Deck Cranes
174 Azimut Thrustrs
2.813 Pumps
957 HVAC System
29 Accomodation
* Being negotiated. Estimate will be confirmed at the contract signing
Drilling Rigs
Main demands for equipment – Drilling Package
Demand for the 29 Drilling Rigs to be delivered between 2016 and 2020
Equipment
Demand
ELECTRICAL & INSTRUMENTS AUTOMATION SYSTEM (ESD,fire/gas detection, Ship Sever ,electrical power
(transfomers/swicth borders) (System,UPS system)
29
HEAVE COMPENSATION SET
29
TOPDRIVES & ASSOCIATED EQUIPMENT(907 mtx 2x857 KW)
29
VERTICAL PIPEHANDLING - STANBUILDING
29
TRAVELING EQUIPMENT - GENERAL
29
DRAWWORKS AND MACHINERY(8508 KN /10056 KN)
29
ROTARY TABLE & ASSOCIATED EQUIPMENT(47,5 KN, 40 rpm)
29
HYDRAULIC ROUGHNECKS FOR WELL CENTRE & STADBUILDING
29
RISER & PIPE RACK HANDLING SYSTEM
29
HYDRAULIC POWER UNIT(4x 150 KW + 1x 9 KW)
145
MUD SYSTEM (Pums, accessories, mixer)7500 psi x 4 un.
29
CHOKE & KILL MANIFOLD
29
DRILLERS CONTROL CABIN & CONTROL SYSTEM
29
BOP / XMAS TREE TRANSPORTATIO / HANDLING SYSTEM
29
RISER TENSIONING SYSTEM
29
BULK MUD & CEMENT SYSTEM
29
SUBSEA PACKAGE
29
Source: Petrobras; Sinaval
Drilling Rigs
Main demands for equipment – Ship Package
Demand for the 29 Drilling Rigs to be delivered between 2016 and 2020
Equipament
Demand
ELECTRICAL & INSTRUMENTS AUTOMATION SYSTEM (ESD,fire/gas detection, Ship Sever ,electrical power
(transfomers/swith borders) (System,UPS system)
29
MAIN DIESEL GENERATORS SETS(7680 KW X720 RPMX11000v)
174
EMERGENCY GENERATOR SET (1180 KW x1800 rpmx600V)
29
DECK CRANE-Lattice boom 25tx42m
87
DECK CRANES-KNUCKLE BOOM -25TX45M + 1X85T X19M
58
AZIMUTH THRUSTERS(4500 kwX4,50M Dia)
174
ANCHORING & MORING EQUIPMENTS(electrichal hyd. Driven)
29
PUMPS( centrifugal,Pneumatics,Positive displac.)
2.813
HVAC SYSTEM (Main machines) (un)
87
HVAC SYSTEM (Self-container) (un)
870
ACCOMODATION MODULE (Persons)
29
PIPING ( ton)
17.576
FITTINGS (ton)
11.424
CABLE (Electrical / Instrumentation / Telecom) (km)
23.200
VALVES (ton)
21.490
Source: Petrobras; Sinaval
Jobs
2000
1.910
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
3.976
6.493
7.465
12.651
14.442
19.600
39.000
40.277
46.500
56.112
59.167
62.036
78.136
Generation of jobs
untill 2013
78.136
Balance delivery 2013
Vessels and Platforms
6 production platforms
2 Promef vessels
21 supply vessels
10 pushers
44 barges
Fonte: SINAVAL / DFMM
Works & Jobs
State / Localization
Rio de Janeiro
São Paulo
Espírito Santo
Total Southeast
Santa Catarina
Rio Grande do Sul
Total South
Alagoas
Pernambuco (Suape)
Bahia
Ceará
Sergipe
Total Northeast
Pará (Belém)
Amazonas
Total North
Total
Works
97
116
9
222
48
20
68
-36
6
ND
ND
42
37
4
41
373
Part. %
26,01
31,10
2,41
59,52
12,87
5,36
18,23
-9,65
1,61
ND
ND
11,26
9,92
1,07
10,99
100,00
Jobs
30.506
1.782
410
32.698
4.247
19.954
24.201
ND
7.923
92
702
38
8.755
580
11.902
12.482
78.136
Part. %
39,05,
2,28
0,52
41,85
5,43
25,54
30,97
-10,14
0,12
0,90
0,05
11,21
0,74
15,23
15,97
100,00
Naval Polos
Shipbuilding Polos
In operation:
Rio de Janeiro, Rio Grande do Sul,
Amazonas, Pernambuco e Santa
Catarina
Under implementation:
Bahia e Espírito Santo.
SINAVAL Associates
ALIANÇA S. A. – Indústria Naval e Empresa de Navegação
Estaleiro Enseada S. A. - KAWASAKI - JAPAN
ARPOADOR Engenharia Ltda.
Estaleiro MAUÁ S. A
BENETEAU Brasil Ltda. - BENETEAU - FRANCE
Estaleiro NAVSHIP Ltda. - EDISON CHOUEST - USA
BR Offshore S. A.
Estaleiro OCEANA S. A.
BRASFELS S.A. - KEPPEL FELS SINGAPORE
Estaleiro RIO MAGUARI S. A.
BRAVANTE – Navegação SÃO MIGUEL Ltda.
Estaleiro RIO TIETÊ Ltda.
CAMARGO CORRÊA Naval Participações Ltda.
Estaleiros do Brasil S. A. –EBR – TOYO - JAPAN
CMO Construções e Montagem Offshore S.A.
ETP Engenharia Ltda.
CNI – Construções Navais Itajaí S. A.
ICN – Itaguaí Construções Navais S. A.
CONSTRUCAP CCPS Engenharia e Comércio S.A.
INTECNIAL S.A.
Construtora QUEIROZ GALVÃO S. A.
KEPPEL Singmarine Brasil Ltda. – KEPPEL FELS - SINGAPORE
COREMA Indústria e Comércio Ltda.
MAC LAREN OIL Estaleiros Ltda.
DETROIT Brasil Ltda. - DETROIT GROUP - CHILE
NAPROSERVICE Offshore Estaleiros do Brasil Ltda.
DOCK BRASIL Engenharia e Serviços Ltda.
OSX Construção Naval S. A.
DOCKSHORE Navegação e Serviços Ltda.
QUIP S. A.
DSN Equipemar Engenharia e Indústria Naval Ltda.
RG Estaleiros S.A. -
EASA – Estaleiros Amazônia S. A.
RIO NAVE Serviços Navais Ltda.
ECOVIX – Engevix Construções Oceânicas S. A. – MITSUBISHI - JAPAN
SERMETAL Estaleiros Ltda.
EISA Alagoas S. A.
SRD Offshore S. A.
EISA -Estaleiro Ilha S. A.
TOYO SETAL S. A. – TOYO - JAPAN
EJA – Estaleiro Jurong Aracruz Ltda. - SINGAPORE
TRIUNFO Operadora Portuária Ltda.
Empresa Brasileira de Reparos Navais S. A. -RENAVE
UTC Engenharia S. A.
ENAVAL – Engenharia Naval e Offshore Ltda.
VARD Brazil Electro Ltda. - FINCANTIERI - ITALY
Estaleiro ATLÂNTICO SUL S. A. – ISHIKAWAGIMA - JAPAN
VARD Niterói S. A. - FINCANTIERI - ITALY
Estaleiro BIBI Ltda.
VARD PROMAR S. A. - FINCANTIERI - ITALY
Estaleiro BRASA Ltda. - SBM GROUP - NORWEG
VELLROY Estaleiros do Brasil Ltda.
WILSON, SONS – Com Ind e Ag de Naveg Ltda. – WILSON, SONS - UK
SINAVAL – SINDICATO NACIONAL DA INDÚSTRIA
DA CONSTRUÇÃO E REPARAÇÃO NAVAL E OFFSHORE
Tel.: +55 (21) 2532-4878 / 2533-4568
Fax: + 55 (21) 2533-5310
E-mail: [email protected]
www.sinaval.org.br