Energia Sierra Juarez US Transmission Line
Transcrição
Energia Sierra Juarez US Transmission Line
Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-59 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-60 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-61 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-62 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-63 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-64 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-65 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-66 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-67 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-68 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-69 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-70 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-71 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-72 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-73 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-74 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-75 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-76 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-77 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-78 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-79 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-80 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-81 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-82 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-83 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-84 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-1: The fire hazard severity map used for Figure 3.9-1 is from CAL FIRE, 2007, as noted in the figure sources. DOE reviewed the relevant fire hazard maps and confirmed that the CAL FIRE 2007 fire hazard severity map is the current adopted fire hazard severity zone map. As shown in the 2007 map, the ESJ U.S. Transmission Line project would be constructed primarily in an area that has a fire hazard designated of “very high.” A more recent CAL FIRE map published in May 2008, which is not yet adopted, indicates a recommended designation of “Very High Fire Hazard Severity Zone” for the ESJ U.S. Transmission Line project site. This more recent map, if adopted, would appear to retain the currently adopted fire hazard severity rating for the project site. These fire hazard severity ranking maps are available online at: http://www.fire.ca.gov/fire_prevention/fire_prevention.php Energia Sierra Juarez U.S. Transmission Line Final EIS 600-85 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-2: Section 3.9 is revised to indicate that in San Diego County as a whole, there have been several major wildfires in the past 10 years. RESPONSE TO 602-3: The Insurance Services Office, Inc. (ISO) publishes information regarding its numerical grading system for fire protection, which is one determinant of fire insurance rates. That information indicates that the scores are based on a community’s fire suppression capabilities. The presence of potential hazards in the area is not identified as a factor in the ISO score. Additional information is available online at: http://www.isomitigation.com/ppc/2000/ppc2007.html. Energia Sierra Juarez U.S. Transmission Line Final EIS 600-86 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-87 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-88 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-4: Refer to the response to comment 305-1 for information on assurances that the transmission line would be used only to transmit electricity generated from renewable sources. Energia Sierra Juarez U.S. Transmission Line Final EIS 600-89 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-90 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-5: A performance bond of this nature would be best addressed by local agencies that have the authority to monitor for compliance and provide enforcement. DOE will consider this as a potential mitigation in the Presidential permit. Energia Sierra Juarez U.S. Transmission Line Final EIS 600-91 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-92 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-93 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-94 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-95 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-96 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-97 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-98 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-99 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-100 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-101 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-102 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-6: Refer to Section 3.5.2 for information on the procedures the applicant would follow if unanticipated archaeological finds are encountered during project construction. Energia Sierra Juarez U.S. Transmission Line Final EIS 600-103 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-7: Potential socioeconomic impacts associated with short-term jobs from the ESJ U.S. Transmission Line project are addressed in EIS Section 3.13. Comments pertaining to the merits of the project with respect to labor policy, federal energy policy, and California utility regulations are outside the scope of the NEPA process. DOE will consider these comments as well as all other comments received in that proceeding before making a final determination on the permit application. Energia Sierra Juarez U.S. Transmission Line Final EIS 600-104 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-105 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-106 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-107 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-108 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-109 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-110 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-111 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-112 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-113 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-114 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-115 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-116 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-117 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-118 May 2012 Volume 3 Comments and Responses RESPONSE TO 602-8: Section 2.8.1, which was added to the EIS in response to comments, addresses the potential of a direct interconnection to Mexican transmission lines using the WECC transmission corridor and explains that this alternative was considered but dismissed from detailed analysis. Refer to Section 2.8.1 and the response to comment 101-8 for more information. Energia Sierra Juarez U.S. Transmission Line Final EIS 600-119 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-120 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-121 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-122 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-123 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-124 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-125 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-126 May 2012 Volume 3 Comments and Responses Energia Sierra Juarez U.S. Transmission Line Final EIS 600-127 May 2012 Volume 3 Comments and Responses This page intentionally left blank Energia Sierra Juarez U.S. Transmission Line Final EIS 600-128 May 2012
Documentos relacionados
Unidade 03 - JS - Exemplo 12 - js
/media/56025ADB025AC023/Private/Eddie/Empresas…/Disc_PI2/Exemplos/JavaScript/js/jsExemplo12.js Page 2 of 2 Fri 01 Mar 2013 11:27:46 AM BRT
Leia mais