HINDUSTAN PETROLEUM CORPORATION LIMITED, GRESHAM HOUSE ADDITIONAL TANKAGE WORK AT AJMER, REWARI & JAIPUR TIME SCHEDULE Details of tanks to be constructed and Completion Schedule are shown in the Table below: LOCATION Ajmer Rewari Jaipur Details of tanks to be constructed 24 M Dia x 14 M Ht- 2 Nos. (FR) 18 M Dia x 12 M Ht- 2 Nos. (FR) 17 M Dia x 12 M Ht - 1 No. (FR) 20 M Dia x 14 M Ht - 2 Nos (CR) 13 M Dia x 14 M Ht – 1 No. (OR) 28 M Dia x 14 M Ht - 1 Nos (FR) 18 M Dia x 13 M Ht - 2 Nos (FR) Completion period 9 months 10 months 9 months FR – Floating Roof, CR- Cone Roof, OR-Open Roof 1.0 COMPLETION PERIOD: Package wise completion period for the execution of job from date of LOI is given in Table above. Note: If an applicant is qualified for more than one package, the completion period of individual package as specified in aboveTable shall be applicable for that particular location and LD clause will be applicable on location wise bsis. NOTE: 1) Time for completion shall be reckoned from the date of issue of Fax/ Letter of Intent by HPCL. 2) Daily working hours will be from Monday to Saturday 8:30 Hrs to 17:30 Hrs. Sunday will be holidays. All other holidays declared at Terminal will be treated as holidays. 3) Extra Working Hours beyond point No2/ on holidays above on request from contractor will be permitted on sole discretion of Location-in-Charge. Signature & Seal of Bidder Page 1 of 1